HI Gurus
I have requirement that when i save the delivery in vlo1n then immediately the billing screen VF01 should appear automatically
how to do that
Thanks in advance
Rajesh
Thanks for the Info
Through Badi call method it is working fine
Rajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
checked the back ground there is no job running
It is a configuration setting as i have debuged the entire vlo1n program with the help of abaper
can any one guide me in this
Thanks in advance
Rajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I dont think in standard its possible. But you can check with ur technical consultant for any user exit.
Here is list of some of the user exits
https://www.sdn.sap.com/irj/scn/wiki?path=/display/erplo/sdUserexits
Automatic billing you can create by scheduling a job. but screen sequence i am not very sure.
Thanks,
Raja
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
To Be precise for the above question
when i do the PGI the screen immediately should take me to the invoice screen overview inside the vf01
Thanks in Advance
Rajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I hope so this can be done
by creating program & schduling the job, system can take to the VF01 t.code after PGI is done.
Here creating program & schduling the job for taking to VFO1 t.code based on PGI.
or
If you want to run VF01 transaction in back ground once PGI is done that can be possiable by schduling the job in back ground.
Regards,
RAM
Hi,
can you elaborate more on your business requirement behind this.
Its not recommended to change the standard SAP process of PGI and then perform billing exclusively either with VF01 or VF04 unless it cant be acheived in any other way.
And can you tell in a scenario where you PGI about 50 deliveries, is it better to do
1. collective billing with VF04
or
2. Each time invoke VF01 with lot of modification effort.
Regards
Sadhu Kishore
User | Count |
---|---|
103 | |
7 | |
7 | |
6 | |
5 | |
5 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.