Dear Experts,

I have maintained Reorder Point Planning Settings (VB) and maintained Reorder Point, Safety Stock, Minimum & Maximum Lot size quantities.

I have total 9000 materials & when I run MRP through MD01, system creating only some requisitions and rest not creating eventhough stock is below Re order point.

What could be the reason & tell what exactly I am missing.

Thanks in advance

Kishore Kumar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear Kishore,

Run MD02 for the material for which no requisition has been created in MD01.If the requisition is created then check the variant you created for running MD01.

Satish Purandare

Former Member
0 Kudos

Dear Satish,

Thanks for your prompt reply.

My problem is system is creating PR only 10% of the materials. why and what exactly I am missing.

Can explain anybody?