Dear All

What is the t- code for Quality inspection

regards,

Sima

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Scenario: Raw material is received from vendor and kept in inson lot .QA people has to inspect it and should give approval so that the stock moves to unrestricted stock.

Follow these steps:

1.Create Material Master Record with QM View.

2.Activate QM Proc/ Specify Control Key 0001.

3. choose Inspn set up and inspn type to be entered as 01 and set the active indicator.

4. Create Q-info record with material / vendor.(qi01)

5. Enter the release by date as 31.12.9999 and save.

6.Create inspn plan (QP01)with usage 5(GR) and status 4 and enter the control key as PPQM.

8.Choose the operation and assign the inspn characteristic / sampling procedure

9.MD61/MD02/MD04

10 Convert the Purchase requisition as Purchase Order.

11. Receive the Material against the PO.

12.Now qm lot will be created.

13.qa02 check inspn plan/sample.

14.qe51n results recording lot origin 01/mat no/execute and record results.

15.qa11 ud code select accept and choose inspn tab page and type the qty to be proposed and save.

16. Now the stock will be posted to unrestricted use stock.

Regards,

nandha

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

You can use QA32 for inspection results recording,usage decission in a single transaction

Regards

Ramakrishna

Former Member
0 Kudos

Pls. explain the scenario of quality inspection.

Actully When the material comes to store (for quality inspection) What are the steps involed to send them to QA . We will do GRN first or QA first How should I block the material for GRN and at the same time send for QA

regards,

sima

Former Member
0 Kudos

Hi

If Quality management module implemented then the steps involved are:

1. Assigning the Inspection types to Material master in QM view.

2. Inspection lot will be created once you do the GR automatically and the stock will be posted to Quality stock.

3. Quality inspection will be carried out as per the inspection type and results will be recorded for the inspection lot.

4.After Results recording, Usage decision will taken.

5.After Usage decision, Stock will be moved to Unrestricted stock if it is OK otherwise to blocked stock if rejected.

Regards

Ramakrishna

Former Member
0 Kudos

We are not implementing QM only MM module is their

Former Member
0 Kudos

Hi,

then you are going to be using the QI stock instead and posting to it eiother by changing the stock type at GR stage (MIGO) or by transaferrinf stock to QI stock via MB1B and movement type 321 and 322 (322 to put unrestricted stock into QI and 321 to get it out again)

Steve B

Former Member
0 Kudos

Hi Seema,

While doing the GRN, you can assign where do you want to put the materials to. In MIGO three options are there, unrestricted use, blocked stock and quality inspection. So select where do you want to keep the material to.

Then do the MB1B, for transfering to unrestricted use from quality inspection with movement type 322.

Regards