Hi All,

We have an integrated project with Lotus notes. For that purpose we have created a Z-BAPI using the BAPI '' for posting FI document into the SAP system. The Lotus pushes the data from their system into the BAPI & then that BAPI posts the document in SAP.

We teste several different scenarios & which were successfully performed. But except for a single Cost Center.

The system allows posting of all combinations into system except for that particular Cost center where the system throws a (a) Balancing profit center missing in the line 001, which is actually a debit (40) entry & (b) Missing CO Object assignment for all the debit GL Accounts been used.

This problem in this particular cost center occurs only on the Lotus side; when we try to post the same data into the same cost center in the BAPI through SAP system; system successfully posts document for that combination too similar to others.

System is only throwing error to the lotus side.

Please suggest,

Regards

Pratham

Accepted Solutions (0)

Answers (1)

Answers (1)

suma_mani
Active Contributor
0 Kudos

Hi Pratham,

As per above query i thought no profit center assigned in cost center master data.