Dear Gurus

I have 3 BOM for a material A, 1 routing, so i have 3 PV's , how MRP select the 3rd PV automatically.

any customization setting is there to select 3 rd pv only for MRP run.

regards

vinoth

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Try by maintaining different lot size

Former Member
0 Kudos

Hi,

Keep the required production version on top of all production version and maintain the selection value -2 in mrp4 view of material master.

or

Lock the non-relevant production versions in production version details screen of mrp4 view of matl master . U can easily lock and unlock any production version.

during mrp run system only looks for active production version.

Regards,

Imran

Answers (5)

Answers (5)

former_member184655
Active Contributor
0 Kudos

Dear Vinoth,

1.You can diffrentiate the 3 production versions either using the validity dates or Lot size or using the

status.

2. If you maintain the same lot size range and validity dates for more than one production version the

system always picks up the first production version defaulty.

3.Either you have to set the status as locked or else maintain different lot size ranges and then try.

Regards

Mangalraj.S

Former Member
0 Kudos

HI

1.PVs are selected based on lot sizes -requirment. PV1 lot size is 0 to 100 PV 2 100 - 100000,

if requiremnt comes for 2000 then system will select the PV2.

if there are sme lot sizes for Pvs then system will slect by default the fisrt one.

2.you can chage PV in planned order also

-ashok

Former Member
0 Kudos

Dear Vinoth,

PV is picked automaticaly base on ur lot size and validity date. if u maintain in OPL8, prod. version automatic selection is 0, u need to maintain in materail master MRP view Bom explosion as 3 only by production version. when u run the MRP with respect to ur lot size and validity date it will pick the corresponding PV.

if u want to make it should pick only PV03 always by default, in MRP 4 view maintain it in frist row,

sree

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

There is no manual selection of prod versions for planned orders in MRP run. MRP always select prod version/BOM based on the selection criteria in MRP4 view. If you have 3 prod versions with selection criteria 2 "selection by prod version" then the first valid prod version will be selected.

Itdepend upon the lot size and validity date of Production version and BOM.

For 0002 if the lot-size is different 101 to 200 then for order qty of 150 prod version 0002 is selected.

Or In MD61,when you enter PIRs ,go to schedule in tab page,on menu bar go to "setting"&select 'production version'.Now in 'Version' field you can choose any version,out of existing production version.

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi,

It will not select the 3rd one automatically , but it selects the first valid one according to lot size range, validity period .

IF YOU MAKE THE SETTING IN OPL8 as PV selection is by manual then you can select the required one while creating the order.

Regards

Pragash.R