Hi Gurus Pl. tell me the steps of Configuring the ECM (Engineering Change Management).

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear Sir For configuration ECM please do the following steps

OS27-Activate the BOM Validat Maintainance,EC MAnagement Active, Histoiry requirement,

Also Activate OS54,

Then through CC01 Create the chabge no.

Hope so this will full fill yours requirements

Regards

Bhupendra Singh

Answers (2)

Answers (2)

former_member186193
Active Contributor
0 Kudos

Dear,

Please follow the following steps:

First setup the control data in OS54.

Revision sections

Fields :-

Revision level active x

Ext. revision level x

Higher revision level x

Object Management Record sections

Fields :-

Object maintenance x

Assign alternative date x

Overide value/assignment date sections

Fields :-

Only with leading change mst. x

Setting the Revision level active is to activate the engineering change management for

material master. If you do not want the engineering change management for materials,

remove the tick.

With a tick in "Higher revision level", the new revision level has to be always higher

than the old revision.

Secondly, setup the external number range in OS53.

If you use the internal number range, then remove the external number range.

Third, define the status for the change master records in transaction SM30 - V_T419S.

Change No. Chg Date Chg Dist. Lock Description

Status Poss

1 x x ' ' Active

2 ' ' ' ' ' ' Inactive

3 ' ' ' ' x Locked

Fourth, define modification parameters for the BOM in OS27.

Fields :-

BOM Validty Maint. x

EC Management Active x

History Requirement ' '

Unit Piece PC

The rest of the fields are blank.

If the History Requirement is tick, every time during creation of the BOM, SAP will

prompt your for an ECN number as is compulsory.

Lastly, define fields selection for routing in OP5A.

PP task lists: initial screen -> Change number -> Transaction code -> Tick Req.

Setting the Transaction code fields Required indicate that you have make the ECN number

compulsory when changing the routing.

Finally, do a test by making changes to the Material Master, BOM and Routing.

Regards,

Alok Tiwari

Former Member
0 Kudos

HI,

Go through following link for Configurations for ECM :

http://www.sap-img.com/pp007.htm

Regards,

Tejas