cancel
Showing results for 
Search instead for 
Did you mean: 

Production Order with SLED of specific component

Former Member
0 Kudos

Hi,

is there someway that I can configure SAP so that when I create a production order, it will take the shelf life of a specific component every time?

This will also require that the remaining components should have a shelf life equal or expires after the material?

For example:-

Material

Comments

ABC123

Shelf life will be the FG shelf life

12389999

Shelf life should be equal or expires later than the material ABC123

21378888

Shelf life should be equal or expires later than the material ABC123

Any suggestions or help would be greatly appreciated.

Thanks,
Shane

Accepted Solutions (0)

Answers (1)

Answers (1)

ArturoSenosain
Advisor
Advisor
0 Kudos

Hi. Do you check the Batch Derevation Functionality ?

Batch Derivation - Batch Management (LO-BM) - SAP Library