Dear pp experties

while creating product cost collector for finished product, priliminary cost estimation of the semi finished assembly is not taken by fg, so that backflushing is also getting error messag( error is argument bp15 not contained in table t437d),

pls reply

thanks in advance

devendra

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184655
Active Contributor
0 Kudos

Dear Devendra Kure,

What REM profile have you assigned to your HALB and FERT material?

Which one(FERT & HALB) has a preliminary cost estimate and which one has a standard cost estimate.

Do you mean to say for HALB you are using preliminary costing and for FERT standard cost estimate or

both the materials has only preliminary cost estimate.

Goto KKF6N>enter your FERT material>goto change mode and click on the cost calculation button

and save the datas and then check in MFBF.

Also for your previous threads you have not replied anything and also please allocate points to the

helpful answers and then cloase the thread as answered.

Regards

Mangalraj.S