Hi all,

how to maintain routing & bom for the material in diffrerent quantites like 100 ml 500 ml , 1 lit , 5 lit , 20 lit .

Abhay

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

BOM/Routing material can be maintained as alternative BOM with different lot size values and base quantity. You can select the BOM/routing using production version.

Answers (2)

Answers (2)

former_member196398
Active Contributor
0 Kudos

Abhay,

You need to maintain different Alternate BOM's and Master recipe based on the Final Product quantity. Now you create production version combining the Alternate BOM's and Master recipe, the production version Lot Size validity should be maintained such that the right combination is picked up during order creation.

Example:

Product B - 20 Lit.

BOM: 1

B - Base quantity 20 Lit

Components

C - 20 Lit

D - 1 EA (Pack material)

Recipe - 1

Operation 0010 - 10 minutes of processing

Now create a Production version 0001 - Lot size validity from 19.5 Lit to 20 Lit

BOM -1 and Recipe -1

Hope this helps,

The other option is to have the Final product with different material number and you need to create separate BOM and Recipe for each product.

Regards,

Prasobh

Former Member
0 Kudos

Hi

Kindly calrify you would like to know it for PP-PI or Discrete?

Thanks

Saravana

Former Member
0 Kudos

This requirement for PP-PI . Paint Manufacturing.