cancel
Showing results for 
Search instead for 
Did you mean: 

PM- Multi counters

Former Member
0 Kudos

Hi, pls advise the steps in calibration of equipments using multi-counters. we want system to schedule calibration either 3 months frequency or no of parts checked (100) with that equipmet. which ever completes, the system should schedule calibration on that day. pls advise the steps in maping this calibration process.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

if u want to schedule calibration after 3 months then u can create maintainance plan and through ip30 it can be scheduled after every 3 months.

but as u have written that u want "to schedule calibration either 3 months frequency or no of parts checked (100) with that equipmet. which ever completes " then as per my knowledge u have to create manual lot for this. Automatic creation of calibration lot is not possible.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi ,

Please use multiple counter functionlity.

http://help.sap.com/search/highlightContent.jsp

Regards,

Ramesh