cancel
Showing results for 
Search instead for 
Did you mean: 

Plant Maintenance Refurbishment Order

Former Member
0 Kudos
56

I create a Refurbishment Order. Refurbishment Order is for Servicing a Material from Broken Material to Refurbished Material.

In Order planning costs, different Cost element is picking. This is not relevant to the Order.

Can you please any one resolve the issue.

Regards

Raja

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

In PM module there is possibility of default cost element . Check the settings and change as you want.

Thanks.

S.Subbiah.