Hi experts;

When a PR is created from work order it determines the planning plant as the plant in the PR.

Is there a way to propose other plant (maybe the work center plant)?

Regards

Rotobu

View Entire Topic
Former Member
0 Kudos

Hi all;

I´m talking about Service PR but I can´t use COZF0001 because WERKS (plant) is not a changeable field defined in the structure (EBAN_ORD_CUST) used by the exit.

Maheswaran, I see your point but system let me change manually the plant for components PR and it doesn´t change the responsabilities of planning plant. Same as component PR I just want to identify the Plant where the service must be done.

Regards

Former Member
0 Kudos

Have you tried to change WERKS using other exit??

As my assumption---

Components can be consumed either from Planning Plant or Maintenance Plant. So Responsible plant for Components can be either of these two. But for Services, Planning Plant is the responsible one.

So it could be the reason why system is not allowing to change the Service PR plant.