cancel
Showing results for 
Search instead for 
Did you mean: 

Plant dependent QM settings

lakshmi_prasad7
Contributor
0 Kudos
537

how we will configure 100% sampling procedure in Development client because sampling procedure is master data master data we are not create in golden client.

in plant level settings inspection lot creation tab presetting for sampling procedure lot inspection i want all engineering plants should be 100 % i am not maintained material master level i want plant level how we will configure this sampling procedure in

golden client.

View Entire Topic
Former Member
0 Kudos

I know without creating master data its not possible but still you can use the User Exit QPL10003 -->Sample calculation for inspection lot without plan -->this will calculate the sample size when you do not have task list.

If you have task list then if you not mention the sample size & all your char are "Required char " then sample size will by default becomes the 100%