Dear all,

I have two materials A and B.these materials were having strtegy 20.

THe header materials of these A and B are C and D.They are aslo maintained with strategy 20.

Now I have changed the strategy of A and B as 10.

So after creating req for C and D in MD81 I am getting planned orders for A and B. But In the planned order for A I am finding the sales order number and in the planned order for B ,no sales order number is there. I want the planned order for material A also to not have any sales orders associated with. Because while doing MFBF for A , I am getting the error" planned order allowed only for make to order".

Please help me out in this..

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member189817
Active Contributor
0 Kudos

Hi,

Material If A and B are semifinished assembly and only planned through C and D requirment,we no need to maintain strategy for them. Even though you maintained strategy for A and B it will not have any effect since Pegged requirment is drive from C and D. Check any other open SO or MD81 entries are there for material 'A'.

Regards,

Velmurugan S

Former Member
0 Kudos

Hi,

How are you running MRP? I mean using which t-code?

Do one thing, go to material master of A and find out what is the individual/collective requirements. Make it collective requirements. After that run MRP and check.