Planned order is not being created while running the mrp

Former Member
0 Kudos

Dear Experts,

I am facing a problem while running the mrp.The Planned order for the particular material is not being created while i am running the mrp by MD02 . The required configuration for the MRP has been done in our system but still the Planned order is not being created. I have checked the master data but still i cannot understand the reason .As a result i have to create the planned orders manually.Please advice on this issue and required changes to be done in the master data or the configuration if it is required.

Thanks

hritesh

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Just tell me which MRP type u r using currently in master data mrp views.

To see the mrp type run MRP. and if it is cutomized then

see the MRP type detail. Go for tcode OMDQ.

and response me.

former_member184655
Active Contributor
0 Kudos

Dear Hritesh,

1.check the MRP type for the material and check the planning strategy and the requirements type(assigned in MD61)suits for

the planning strategy assigned in MRP3 view of the material master.

2.If you have selected the strategy as 11 means,check by assigning the mixed MRP indicator as 2 and for planning strategy 70

the mixed MRP indicator as 1.

3.Check the requirements date and the BOM/routing validity.

There could be more factors also,check with this and revert back.

Regards

Mangalraj.S