cancel
Showing results for 
Search instead for 
Did you mean: 

Planned Order Created with Exception Message 52, Strategy 25 in blend of MTO/MTS Scenario

bhagwan_patil
Discoverer
0 Kudos

Dear Team,

After ran MRP on FG Configurable Material (Planning Strategy 25), which is blend of MTO/MTS scenario system.

MRP generated as required planned order upto 3 levels, which is MTO (S/O allocated planned order).

From 4th level SFG material having MTS (Planning Strategy 40) starts and it have again two more level (i.e. 5th & 6th level).

Here system created planned order (LA) at 4th level, with exception message 52 (NO BOM exploded).

Why system has not created planned order (LA) for 5th & 6th level? I tried with ind/col indicator as well but not working.

Kindly suggest which settings needs to be done/changed.

bhagwan_patil
Discoverer
0 Kudos

Hi Leads,

Could you please provide your valuable inputs.

Accepted Solutions (0)

Answers (3)

Answers (3)

bhagwan_patil
Discoverer
0 Kudos

Hi Puri,

I have checked all BOM status and valid from date. All are released.

Thanks,

Bhagwan

former_member261747
Contributor
0 Kudos

Hi Mr Patil

Plz check the BOM status at header level & BOM Valid from date of material at level 4 .

with Regards.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Please refer SAP KBA on it,

1987762 - Error 61 263: Missing configuration in planned order

Check whether the header material and the BOM items from the BOM structure is a configurable material in the Material Master (transaction MM03):

1.Material is marked as configurable on tab "Basic data 2".

2.Plant-specific configuration is set on tab "MRP 3".

Case 1: If the material is not configurable, but a configuration profile exists in transaction CU43, delete the configuration profile and run MRP again.

Case 2: If the material is configurable, but it does not have a configuration profile, create one by using transaction CU41

Best Regards,

R.Brahmankar

bhagwan_patil
Discoverer
0 Kudos

Hi Mr. Brahmankar,

Thank you for reply!!!

Above all settings are already maintained.

My requirement is, MRP should explode the BOM from 4th level to last level as MTS along with variant configuration.

Thanks,

Bhagwan