parallel sequence - scheduling operation

former_member566378
Participant
0 Kudos

Hi,

when I was creating parallel sequence in routing I was faced with problem in scheduling operation.

After making a routing with parallel sequence, which are executing on the others work centers, system doesn’t take into consideration the fact that order is divided on for example two work centers ( parallel sequence ! ).

How to divide the time of operations for equal parts ( or different proportion ) in two work centers.

Please help me solvede this problem.

Artur

Accepted Solutions (1)

Accepted Solutions (1)

mrinalkanti_roy
Active Contributor
0 Kudos

Hi,

Parallel sequence is taken when the operations take place at the same time . If the time needs to be divided between operations and if 1 operation is dependent on another then , 2 operations can be created , one after another with different work centers and there will not be any problem in scheduling.

Hope it helps.

Regards,

Mrinal