Overhead - Quantity Based Overhead

Former Member
0 Kudos
110

Hi everyone,

I having the following problem, I customized the Overhead as follow:

10 B100 Raw Material

11 Act. Raw Mat 10

20 B110 Semi-Finished Goods

30 Material OH 20

40 B200 Production Costs

60 A311 Semi finished Mat OH 11 E02

65 L000 11 E04

70 Manuf. Cost Level 20

80 A300 Administration OH 70 E01

90 B300 Plant Activity

100 A312 Manufacturing OH 90 E03

Line 65 is a Quantity Based Overhead (by plant) and the amount for plant xxxx is 500 USD / 1 ST, the base unit of measure of the material is ST. But when i execute Trx CK11N the value of this overhead it does not apear. The overheads A311, A300 and A312 are porcentage-based overheads and are ok. Could you pleas help me with the Quantity Based Overheads?

Regards

DAG123

Edited by: DAG123 on Jun 16, 2011 7:42 PM

Edited by: DAG123 on Jun 16, 2011 7:45 PM

Accepted Solutions (0)

Answers (1)

Answers (1)

ajaycwa1981
Active Contributor
0 Kudos

Hi

Just check if you have maintained rate for the correct overhead type (2 - Plan) in KZM2

Also, check that the Plant is same for which you are running CK11N and also the Validity date in KZM2

br, Ajay M

Former Member
0 Kudos

Ajay M

Thank you for your reply.

In KZM2 I maintained the overhead L000 as follow:

01.05.2011 30.10.2011 BC00 2 1102 500,00 USD 1 ST

I am executing CK11N in 1102 Plant, I tried using HR insted of ST and it worked for Activities, but for raw materials, with UOM ST it does not work.

This is the result for CK11N form material XXXXX and plant 1102.

1.- 50911 11026001 6001HN 9001721 392,30 0,00 ARS 10,0 HR

2.- 1102 G-CHAS-00 9111507 87,12 15,12 ARS 1,00 ST

3.- 1102 G-EJES-00 9111507 698,76 0,00 ARS 2,00 ST

4.- 1102 000000000000085943 9111999 12,10 1,10 ARS 1,00 ST

5.- 50911 11026002 6002HN 9001741 1.176,90 588,45 ARS 15,0 HR

6.- 50911 9001030 9001030 1,21 1,21 ARS

7.- 50910 9001031 9001031 392,94 392,94 ARS

8.- 50911 9001032 9001032 156,92 156,92 ARS

Line 4 is a raw material with ST UOM, this is the one tha i have the problem. Lines 1 and 5 work ok with quantity based overhead. Lines 6 to 8 are Porcentaje Based overheads.

Regards.