order confirmation-back flushing

Former Member
0 Kudos
40

In one scenario x is final product.x1( semifinished),x2(spare) are dependent materials for final product. x1 has bom r1 and r2 (raw materials).I put all x1,x2,r1,r2 stock available in storage.

To get final product , only final assy of above materials by labour.PIR (md61) created for x and planning run.After planning run, planned order generated for x and converted in to production order and released.

My requirement is on confirmation of production order, backflushing of dependent materials as per bom should be done

what are the fields to be maintained for the above materials.

Is one work center (labour category) enough?

How routing is to be maintained for only assembling of final product.

please explain the entire scenario step by step

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

HI GB

Please check the validity date for BOM.

BOM should be valid on Order start date. Otherwise this error message will come.

Regards

J.Saravan

Former Member
0 Kudos

HI GB

Back flashing is done at four areas.

1) IF you want your material to be back flshed always give it in Material master.

2) If you want at particular Work center as to be back flash. do it at WC level. Any component assigned to this particular WC in routing this will enable back flash.

3) IF you want to do it at routing level do the setting Routing level.

4) If you only for particular production order do the setting at production order.

It depends up on the client requirement and the configuration.

Regards

J.Saravan

Former Member
0 Kudos

If i give in mrp 2 view for all the dependent materials,as 1(always backflush,) is it enough?

Former Member
0 Kudos

Hi,

If you want to always backflush the material ( is where ever the material is used ).. yes you can give BF in Material master.

Regards

Krishna

Former Member
0 Kudos

for x final product,I created order type and assing dependent parameters.After planning run for x, planned order has been generated.While converting planned order to production order, system gives message ,BOM FOR PLANNED ORDER NOT VALID FOR ORDERS

how to solve this problem

Former Member
0 Kudos

In the Routing of final product x,maintain the backflushing indicator for all the components.Then System will automatically propose you these components at the time of confirmation.