new plant setting copied from old plant

former_member324349
Participant
0 Kudos

Dear All,

I am copying one existing plant with sto excise setting and MRP schedukle for Auto STO creation to a new plant.i had copyied the old plant to new plant and changed the name & address of the new plant. what all are other setting i should check and maintain in spro.

regards,

nishith

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Apart from the above settings ,Pls check the following:

1.shipping point assigned to the plant.

2.Pick location determination

3. Shipping point determination.

4.shipping point assignment

5.MRP Parameters & MRP Controllers

6.Special procurement keys

Thanks,

0 Kudos

Hi

Please check the Following

Determine what company code the Plant has to be assigned to

Determine what Purchasing group it has to be linked to ?

Check the Valuation grouping code in SPRO

Verify the Define attributes of material type (OMS2) in SPRO

IF the Plant is used for STO purpose the please go to SPRO->Materials Management ->Purchase order & complete the settings for STO

Thanks