on 2011 Jun 24 8:54 AM
Hi All,
My client has requirment where he needs a monthly lot size "MB" for the Raw materials but that lot size must consolidate the requirements in the past month as well with the requirment of the current month so that we only have one requirement.
In current scenario if we use MB lot size and if we have requirment of 100 pc in month of May and 100 PC in month of June then 2 PR will be created. One for Last month and another for this month. Client wants only one PR for both month and wants Last month requirment sto be clubed with this month requirment it self.
I think I have not made my self clear..
I gave the examples of May and June only for Understanding. In short client needs to clusb all the past due requirments with current month requirment itself. He does not want seperate PR for past months requirment. Now requirment could be 2 or 3 or 4 month old.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
There are more that 1000 Raw materials and most of them have past due requirments. Reason that it has to be done during PR stage it self taht combining different PR to single materials so many materials will be very difficult and time consuming.
Thanks for suggestion though. But client did not accept it.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Use periodic lot size PK. Create a Planning calendor with each period = 2 months.
Regards,
Santopsh Sarda
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
116 | |
8 | |
6 | |
6 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.