Network scheduling...and issue

Former Member
0 Kudos

Dear SAP PS Experts,

1.Can any one explain of network scheduling.

Thanks in Advance

Chandra

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Scheduling determines the earliest and latest start and finish dates for carrying out activities in the network and calculates the required capacity requirements as well as the slack time or "floats".

Activities and Relationships are scheduled. There are two types-

1.Forward scheduling calculates the earliest start and finish dates of activities (earliest dates) and the scheduled finish date of the network. All activities without predecessors in the network are the starting activities. The date from which scheduling starts is the basic start date from the network header or the scheduled start date from backward scheduling, if no basic start date is specified.

2.Backward scheduling calculates the latest start and finish dates of activities (latest dates) and the scheduled start date of the network. All activities without successors in the network are the target activities. The date from which scheduling starts is the basic finish date from the network header or the scheduled finish date from forward scheduling, if no basic finish date is specified

Please refer for details-

http://help.sap.com/saphelp_45b/helpdata/en/c0/1885347860ea35e10000009b38f83b/frameset.htm

Regards

Former Member
0 Kudos

Dear Expert,

Thanx for your reply.

I have rewarded full points.

Regards

Chandra