Hi,

we have book consumption of a material A which is define in bom now bom has been change Material A replace by Material B.

good issue for A material mvt type 261,now my company want to transfer this issue material A repalce by material B,so that system show 261 for material B .

Is there any mvt type to do?

Any suggestion....

shakir

Accepted Solutions (1)

Accepted Solutions (1)

csaba_szommer
Active Contributor
0 Kudos

Hi Shakir,

What was the real consumption? Did you consume materialA or materialB?

If your production consumed materialB but materialA was withrawn because of the old BOM, you have several option to correct this mistake.

In CO13 you can cancel the wrong confirmation and do a new one - in this case you have to correct the component list of your PrdOrd in CO02 (F6 - Component overview), or you can do the correction in CO15 in goods movement. (you have to delete materialA and add materialB)

Other option is to use MB1A with refernce to PrdOrd: you can reverse the withdrawal of materialA via MVT 262 and you can book materialB via MVT 261.

If you use WM (and dynamic bins) you have to create TR for material staging via LB01 (or in case you correct the PrdOrd you can carry out material staging in CO02)

BR

Csaba

Former Member
0 Kudos

Hi, Csaba Szommer

We consume material A as per BOM

1 jan we want that consumption to be show as B

we are late to change BOM as it was change on 8 jan

now all consumption At A have to be transfer to B

we are getting plan order (repetative manufacturing proceess)

what will be step in this case.

thanks

shakir

csaba_szommer
Active Contributor
0 Kudos

Hi Shakir,

You can correct the consumptions as it was written above:

1.

Cancel all related confirmations (CO13) > correct the component list of the PrdOrd > confirm the quantities with proper consumptions (it can occure that you do not have stock of FGs/SFGs and you cannot carry out the cancellation > in this case you can 'create' stock by MB1A 202 and after having executed the cancellation-confirmation process you have to vanish the stock by MB1A 201)

2.

You can realize the proper consumption w/o cancellation:

MB1A 262 materialA + PrdOrd reference > reverse the withdrawal of materialA

MB1A 261 materialB + PrdOrd reference > consumption of materialB for each PrdOrd

3.

This is the easiest to do but isn't very accurate:

MB1A 202 + materialA

MB1A 201 + materialB

In this case you cannot link these movements to PrdOrds...I recommend that you should do option 1 (maybe the 'best') or option 2...or if somebody can say some better solution to you...

BR

Csaba

Answers (2)

Answers (2)

Former Member
0 Kudos

mvt 261 - It is reservation against material through work order.

Please check in Reservation list MB25

Regards

Ravi

csaba_szommer
Active Contributor
Former Member
0 Kudos

Hi,

What is ur actual requirement. You mean want to tranfer the Stcok of Material A to Material B?

Thanks

Raju

Former Member
0 Kudos

Hi,

i dont want stock transfer A to B ,my requirement is ths issue against A (mvt type 261) need to tansfer to B.

shakir

chetan_b
Active Contributor
0 Kudos

Hi,

It is not possible to change material No. in material document but for existing stock you can convert the Stock of material A into material B in MB1B mvt. 309.then issue it using 261.

reward if helpful.

Regards,

Chetan.

Former Member
0 Kudos

Hi, chetan

i get u what r u saying

but what about material A issue 261 it will still stand in system