MTO Scenario--Conversiion to Production order problem

Former Member
0 Kudos
76

Hi

I Have created a Sales Order for a MTO material . Executed MRP . Planned order generated

Now While trying to convert the Planned Order to a Production Order , I am getting the Following Message , the stratetgy group for the material is 20 : requirement type KE

Details of the message .

Thanks in advance

*********************************************************************************************************************

You cannot make an assignment to make-to-order stock

Diagnosis

The component cannot be allocated to an individual stock because make-to-order production and engineer-to-order production cannot be executed with this order.

A possible cause is that you are trying to create an order with reference to a sales-order/project, where an account assignment to a sales order/project is not allowed in the settlement profile that is assigned to the chosen order type. This is inconsistant

Accepted Solutions (1)

Accepted Solutions (1)

former_member740051
Contributor
0 Kudos

HI,

Go to OPJH--> note the settlement profile

Go to OK07--> check the valid receivers for the same settlement profile. Sales order should be allowed to receive the cost.

The above could be the reason for your issue

Vijay

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

1.check the order type that you assigned for . (OPJH) it should have the settlement profile as SD1- SALES ORDER MAKE TO STOCK PRODUCTION.

2. check the settlement profile in spro - controlling - product cost controlling - cost object controlling - product cost per sales order - period end closing - settlement - create settlement profile

It should have the receiver as sales order in the VALID RECEIVER tabs

Former Member
0 Kudos

Looks like the Order type is not assigned with right settlement Profile

Regards

Ratan