MRP

Former Member
0 Kudos
42

Hi Gurus,

We had MRP run on 17.11.08. For a particular material contract was not existing, so a contract was created & souce list, quota were maintained on 20.11.08. For this material we had a individual mrp run on 21.11.08 by tcode md03. The PR output has not been assigned with any contract. Please help.

Regards,

Nitin

Accepted Solutions (1)

Accepted Solutions (1)

former_member581212
Active Contributor
0 Kudos

hi,

check your source list, whether the same source is assigned with the FIX indicator in it and MRP indicator is also set for it...

This may be because the MRP would be taking some other source while MRP run...

also check the valid dates for the source assigned...

pls check and revert back...

Regards

Priyanka.P

Former Member
0 Kudos

Hi Priyanka,

I have already checked all that u have mentioned, is there anything else to be checked.

Regards

Nitin

former_member581212
Active Contributor
0 Kudos

hi,

For source always the source play a big role...

as per my view there shd be some problem with your source list only, did you check the dates?? Are there more than one source ticked with the FIX indicator??

As my last words, Go through your sourcelist one more time...or let me know all the settings which you made at every doc...

Regards

Priyanka.P