on 2013 Aug 19 12:30 PM
Dear,
MRP type in MRP1 view is mandatory field if you have to run the MRP you need to have valid MRP type.
If you are not using the Material requirements planning you can have the MRP type as ND.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vijith,
MRP type is the primary ingrediant for MRP operation. without MRP type it is not possible to plan and execute the requirement of material. please refer to the below link.
http://help.sap.com/saphelp_46c/helpdata/EN/31/72369adc56d11195100060b03c6b76/frameset.htm
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
A MRP type designated to the material explains whether the material is allowed to go through material requirement planning and if the MRP type allows material requirement planning, it explains the type of material planning that is required for the given material at a given plant.
If you want to run MRP then you need to maintain MRP type.
Regards
Biswaranjan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
8 | |
8 | |
6 | |
5 | |
5 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.