MRP for project stock ignores Mateiral Lot size

Former Member
0 Kudos

Dear all

When running MRP (md02/md51) for material with requirements under project stock, MRP run seems to ignore the Lot size procedure from material master (in this case FX) and proceeds with planning via lot-for-lot procudure EX.

In generated planned order, under master data tab, procedure FX is visible, but obviously the lot size does not adhere to that.

Any thoughts?

Thank you

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Prasobh

Your solution worked. I did not expect the need to create a new lot size procedure for project stock, but I guess that's how SAP works in this area.

Thanks for your answer

former_member196398
Active Contributor
0 Kudos

Dear,

I would suggest you to create a new lotsize procedure(OMI4- Transaction) copying the standard "FX" and the only defination you need to change is to is for the field "Lot Size: SOP" - define this field wiht value "2" - Lotsize as in Short term period. Assign this new lotsize for materials related to project.

I am sure, this would work.

Regards,

Prasobh