Hi,

Kindly suggest how to run MPS for multiple items & multi level.

regards,

Mohit

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Use T-code MD41 for MPS single item multilevel but it will plans only those material which are comes under MPS and proper BOM must be defined.

Former Member
0 Kudos

Hi,

MPS run for Multiple Items can be Done using Product Group. List all the Material and Create a Product Group. Run MPS for the Product Group.

Multiple Level Run can be done only if there is Bom.

Regards,

Afzal