cancel
Showing results for 
Search instead for 
Did you mean: 

Movement Error

Former Member
0 Kudos

Hi all,

I ve got a problem with movements. At one of our confirmation point after confirmation i move the material to one of our storage type with GR. But sometimes it does not move to destination storage type, it moves to 901 storage type. After that we find it in COGI and move it to our destination storage type. Not always sometimes it happens.

What can be the reason for this problem ?

Regards,

Accepted Solutions (0)

Answers (2)

Answers (2)

ThomasZloch
Active Contributor
0 Kudos

Not ABAP related, please post again in MM forums.

Thread locked.

Thomas

Former Member
0 Kudos