Hi Experts.

I have created Measuring Point for an equipment and through that measuring point i created a Multiple Counter Maintenance Plan where i given Cycle Length 200 Hours.

But when i scheduled the Plan and later on when measuring Documents created with 210 Hrs total reading.Even though i am refreshing schedule through IP10 system is not generating the Job Card.In multiple counter i have selected Or Link.

I tried same by doing single cycle Performance base but there also i am unable to get the Call object.

Can you guide me where i am missing step.

Equipment is also in Created Status.

Regards,

Kavvya.

Accepted Solutions (1)

Accepted Solutions (1)

former_member385375
Contributor
0 Kudos

Hi

Check that you have entered the counter reading(measuring document) before scheduling your plan. Also check your counter start reading it shall be les than 200Hr (start of cycle)

shakti

Answers (0)