MD04

Former Member
0 Kudos

I have a doubt.. Is there any difference between calculating the actual coverage between the first line in MD04 and the other following lines..

Period......PIR......Requirement.......Receipts.....Available Quantity......ATP Qty...Actual coverage

Stock.......blank....blank.................blank.............629.004...................0...................7,7

10/17/11u2026u20260..........94 - ................... 0u2026u2026u2026 628.910u2026u2026u2026u2026u2026..0u2026u2026u2026u2026u2026u2026.11,7

The first line shows its 7,7..the next line should be less than that only right? but it is increasing?

can anybody tell me how?

Accepted Solutions (0)

Answers (1)

Answers (1)

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear

First of All U should Check what Exact Strategy ur using is it MTS or MTO

hope its MTS ur running

As per ur scenario U can Clearly see that Available Quantity is Reducing here that mean when Requirement Generated The Available Stock is Reducing and the Actual coverage is Increasing.

with Regards

Pushpalas

Former Member
0 Kudos

I do not find any logic in your reply.. If the available quantity is decreasing, then the days that stock could cover the requirements will also decrease.. and thus the actul coverage will also decrease..

former_member311826
Active Contributor
0 Kudos

Hi Karthick,

As per calculation this result is not expected. Can you please check SAP notes. 670449, 863911, 942643

Also confirm me if you have maintain any Safety stock for material.

Former Member
0 Kudos

Yes Abhijit.. WE have safety stock 329442 PC for this material.. can u get something out of it..PLease help me out

Edited by: karthick PP on Oct 23, 2011 9:24 AM

former_member311826
Active Contributor
0 Kudos

Dear Karthick,

Have you gone through the above notes & checked if its applicable to your release ? I suspect system is not considering any of the MRP element in calculations.

I tried a lot but Frankly speaking not able to find how system is calculating, I searched for SAP notes & found one note where if material is assigned with safety stock can lead to error in calculation. Please check sap note 942643. Contact your basis guy check if release is applicable to you. Try it on Dev server.

Before this check calculation for another material where safety stock is not maintain in MM. If its incorrect for that also I will suggest you to write a mail to SAP & get there help. Bcoz through forum it will be difficult to help you out.

Former Member
0 Kudos

Yes I will try..THanks for ur responses..

former_member311826
Active Contributor
0 Kudos

If you get the reason please share with us.