cancel
Showing results for 
Search instead for 
Did you mean: 

MB5L

Former Member
0 Kudos

Hi,

I schedule a background job for MB5L and the spool is created.

I executed the report with plant as the only input parameter.

In the spool I get two G/L ACCOUNTS.

When I execute in foreground I get the same G/L account but when i double click on any of the G/L accounts it gives me material wise details.

How to do this thing with the spool as I need it material wise.

Best Regards

Ankur

Accepted Solutions (1)

Accepted Solutions (1)

JL23
Active Contributor
0 Kudos

Have you tried the  check box in the selection screen to directly show material lines ?

Former Member
0 Kudos

yes it works thanks

Answers (0)