on 2008 Oct 22 7:36 AM
hi,
i am doing stock transfer from storage locn to st loctn,stock which i want to transfer is non valuated and the other material is valuated ,so how to do valuation of material which is nonvaluated.
thks.
hi,
CHECK HERe
SPRO--> logistcs general --> MM --> Basic settings --> Material type --> Define material type --> choose any material type -> make the value update tick...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
my question is if i am doing stock transfer from st locn to st locn i.e
A to B mat, A mat is non valuated ,B mat is valuated,so when i transfer stock from A to B at that time only qty is updating in B , how to increase the value because ur B mat is valuated so both qty and value should be updated.
thanks.
Edited by: AMIT RANE on Oct 22, 2008 10:50 AM
Hi,
It is not stock transfer from Str loc to Str loc for Mat A to Mat B
It is Material to Material transfer in MB1B with 309 Mvt type.
If the both Materials is having the Same Base unit of measure & same material type you can transfer the stock from 1 mat to another material in str locations.
rgds
gsc
User | Count |
---|---|
109 | |
9 | |
8 | |
6 | |
5 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.