Material Type Mismatch -- Error message

Former Member
0 Kudos
509

Dear Sir,

A wrong entry ( GR) done by the end user in T. code MB1C Movement type used 532 before the 531 for the process order in different material type means process order header material is SFG Imported to SFG Indian, so a material document have generated for this , Now it is the wrong entry and we have tried to canceled by T. code MBST and MB1C t system through the error message with no message type and help -


Material Type Mismatch.

How we can cancel this type of entry for nullify the movement in process order.

regards

ALOK

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Thanks ,

No no... they have done Movement 532 before the 531 , which happened wrong , now system is not allowing the 531 against the material document which has been created for this wrong entry and through the error message ''Material Type Mismatch'' ,

Process order Header Material is 62600120 which is SFG Imported and material 61601115 which is SFG Indian used during the 532 movement.

regards

ALOK S.

Former Member
0 Kudos

Hii,

the question is little confusing... u mean to say they used 531 movement type and not able to reverse through 532.... did they issued the material to an order using 531.... did u check the material type... is it same

Thanks & Regards,

sampath

Edited by: sampath s on May 11, 2011 12:53 PM