on 2008 Jul 15 8:04 AM
Dear Expert.
After one material was stocked (GR), the worker splited the material into two materials.
(It is reverse of subcontract)
That is.
1) GR : AB Material 1Qty.
2) Split : AB Material issue 1Qty
A Material GR 1 Qty
B Material GR 1 Qty
I can't find a suitable process.
Let me know how to handle it.
Thank you in advance.
Best regards,
KilNam
Hi
This is only applicable if your system is IS- Retail
319 Splitting up structured material into components (Retail)
You can enter the splitting up of a structured material manually using movement type 319.
You can configure Customizing so that a structured material (for example, a set, prepack, or display is automatically split up into its components at the time of goods receipt. The system posts the split using movement type 319. In this process, the BOM header material is posted and each of the component stocks are increased. You can also use this function if you use the Warehouse Management System (LE-WM).
Possible special stock indicators:
None
Example:
A box of the structured material S contains 3 pieces of the component K1 and 4 pieces of the component K2. The following material document items result after the material is split up upon goods receipt:
Qty Unit Material Movement type
1 box S 101 +
1 box S 319 -
4 piece K1 319 +
5 piece K2 319 +
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
112 | |
9 | |
8 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.