cancel
Showing results for 
Search instead for 
Did you mean: 

material groupwise stock

Former Member
0 Kudos

hi all,

In my company we have created material groups as for example CV-BU001

where CV stands for CIVIL WORK

BU stands for BUILDING

001 tstands for material (say cement)

when I check stock report the report is available only for material group thet is CV-BU001. But our company management wants report at "CV" level or CV-BU level. Is that possible with SAP.

Accepted Solutions (0)

Answers (3)

Answers (3)

csaba_szommer
Active Contributor
0 Kudos

Hi RAKESH,

Maybe I do not understand your problem as well as I should but can't you use the following:

CV level >> CV* in material group field in MB52

CV-BU level >> CV-BU*

?

Csaba

Former Member
0 Kudos

Dear Rakesh,

Use MC.1, MC.2 report for material group wise stock and value for same.

Use switch drill down and select material group

Will be helpful to you.

Regards

Chetan Mistry

Former Member
0 Kudos

You Want Heirarchy, for that you need to use Project Systems..

Material group is grouping of similar materilas..

Former Member
0 Kudos

what is the solution in PS for that. can u elaboraet ur answer.