Material check in alternate plant

Former Member
0 Kudos

Hi friend,

In MTO scenarion I have same (component) material in two different plant within the same client. During MRP run dependent requirement should be checked in the alternate plant's and if material is available reservation should be generated.

Or is it possible to convert planned order generated in plant 1100 be transfered to plant 1200 and also converted to production order.

Pls suggest the solution.

amol

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Yes you can do by using the special procuement key in material master for STO from other plant.

Rewards the Point

Answers (1)

Answers (1)

Former Member
0 Kudos

Thanx