Dear Guru

Plz suggest how to map the material in repetative manufacturing

scenario:

input material : A, B AND C

Output material: x y and z

how to map in backflush(mfbf) . In one shot we want to enter the input and output material . We have to enter actual consumption of input and output material

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Ank,

In the confirmation screen MFBF you can confirm at a time only for a single material and for this product the corresponding

components can be posted which will be carried out for 131 & 261 movement for GR & GI respectively.

It's not possible to make GR for more than one product at time,but however using MF42N it's possible to carryout collective

backflush for a set of products based on the input given.

now check with this and revert back with your queries.

Regards

Mangalraj.S

Former Member
0 Kudos

thanks for reply its helpful

how to map this scenario in planning (md61) and convert into production order (md02)

Answers (2)

Answers (2)

Former Member
0 Kudos

Exactly what are the Input materials and Output materials.

Can you tell us in details.

Former Member
0 Kudos

how to map for planning and convert into production order

former_member184655
Active Contributor
0 Kudos

Dear Ank,

In a REM scenario you get planned orders of order type PE which can't be convereted into production orders.

Confirmations will be carried out only based on planned order.

Come back with your further queries.

Regards

Mangalraj.S

Former Member
0 Kudos

NOT IN PRODUCTION ORDER , WE WANT TO CONVERT INTO PLANT ORDER

Former Member
0 Kudos

if input material a=10 no , b=20 no and c=10 no.

but we don't know how much it consumed by output product x,y and z. But total consumption of a, b and c is equal to total output of x,y, and z

PLZ SUGGEST HOW TO DO PLANNING IN MD61 AND HOW TO CONVERT INTO PLANT ORDER MD02