hello

could some one tell me when i should i maintain overhead rates for the cost centers.

thanks

ram

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member674271
Contributor
0 Kudos

Hi,

If I do not misunderstand your question on "WHEN", to take the overhead calculation on cost center effective, you need to setup the costing sheet and assign the costing sheet to the receiving cost centers to collect overhead before you take overhead calculation for them.