LT09 before cowbhuwe

Former Member
0 Kudos

Hello,

Is there a way to post HU in a warehouse before doing GR in production order?

To say differently: Is it possible to do LTO9 after cowbpack and before cowhbuwe?

Thanks

S

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184701
Active Contributor
0 Kudos

can you please share your business scenario?

Former Member
0 Kudos

My client works with the MAP (Moving average price)

So, the GR of the product must be done after the consumption of all the materials. They used to declare the consumptions at Day+1.

The need is to be able to store pallets in the warehouse before doing the GR.

Thanks;