Lot size procedure

Former Member
0 Kudos
496

Dear Gurus,

I am having a sales order for quantity 10 items and my scenario is MTO (20). Due to my production constrains... I can go for the production for 1 piece only. At a time I can not produce more than one item. So my MRP run should create individual planned orders (of quantity 1) for the total Sales order quantity. I tried with fixed lot sizing (lot size = 1). But still system is creating planned order for 10 items. What could be problem???

Regards.

Accepted Solutions (0)

Answers (3)

Answers (3)

zlcalero
Explorer
0 Kudos

Hi, please check in TX OMD7 or OMDY, the quantity in MAX.PUR.ORD.PR.(max ord ord propose). Change or leave blank that field and test MD02.

Change Material (mm02) in MRP FX , and fixed lot size 1

Regards

ZCalero

Former Member
0 Kudos

Dear,

One alternative solution is - you can go for EX, and system will create full qty planned order. Go for partial conversion of planned order to indivisual production order one by one.

Former Member
0 Kudos

Hi kodand,

Please check with lotsize settings of FX at OMI4.

MTO lot size = 2, may be in ur case blank.

Please try and comeback.

Please update your previous thread.

Regards

Pradeep

Former Member
0 Kudos

Dear Pradeep,

I didn't get the field in OMI4. There is no MTO lot size field.

Regards.

Former Member
0 Kudos

Hi Kodand.

Please check once again, it is present in the bottom area of screen (OMI4), just press tthe page down key.

OMI4->Mrplotsize-FX->Pagedown key.

what version your using

Regards

Pradeep

Former Member
0 Kudos

Dear Pradeep,

This key is not working..

Regards.

former_member189817
Active Contributor
0 Kudos

Hi Pradeep ,

In lot size procedure give maximum lotsize as 1.You may give any lot size procedure EX or FX or etc.

Former Member
0 Kudos

Hi Kodand.

Please check following settings.

SG for Planning material = 20

Sale order Requirement type = KE

Lotsize = FX & Fixed lotsize = 1 at MRP view of Planning material.

Settings at OMI4 for FX, under the section of “lot size for the short term period”

1.LotSizeProced.= S (Static lot-sizing pro)

2.Lot-size ind. = F (Fixed lot size )

3.MTO = 2 (Lot size as in short-term period)

Then run the MRP & planning mode=3 and check the result.

Regards

Pradeep