Hi

I've set a COMAC job to perform ATP check for all production orders. but sometimes when a production order is locked by a user (CO11N or CO02), the job fails into ERROR. Is it possible to ignore the lock or grab the ownership somehow or even just skip this production order to move on with the rest? Thanks.

kljf

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello kljf

this is a documented issue you find a solution for this in note 540352

BR Sabine

kljf_wiee
Participant
0 Kudos

Thanks a lot Sabine!