HELLO ALL,

There is a customer 12345 (SP) for which the statistical customer (YX) 56789 is assigned,

there is a material ABCDE which is in the exclusion list of the SP and inclusion list of the YX partner function.

when I create order for SP with the ABCDE material, its allowing, the requirement is it should not allow to do the same.

thanks in advance

MS.,

Message was edited by: Jyoti Prakash - Please don't use all CAPS in subject title or discussion body.

View Entire Topic
0 Kudos

Hi venu,

thanks for the instant reply,

there is material determination exist for this material and if I enter the material ABCDE
then the mat EFGHI is determined. for EFGHI there is no listing./ exclusion is maintained.

now I maintained and checked for EFGHI
its working