cancel
Showing results for 
Search instead for 
Did you mean: 

Link for subcontract purchase order and 541 Movement type

daria_garrido
Discoverer
0 Kudos
296

I am not able to identify a link between a PO and the material document posted from ZME2O.

Is there any field or flag that allows me to know if the subcontract PO has been issued?

Thanks!

Accepted Solutions (0)

Answers (2)

Answers (2)

DominikTylczyn
Active Contributor
0 Kudos

Hello @daria_garrido 

I don't think that a material movement providing a subcontractor with components is linked directly to subcontracting purchase orders. ME2O (I assume your ZME2O works the same) calculates net requirements of components to be provided and moves them to the subcontractor in bulk. Therefore several subcontracting POs can be supplied with a single material movement.

Best regards

Dominik Tylczynski

daria_garrido
Discoverer
0 Kudos
yes you are right. it is works the same. performing ME20 there is no way to know that a PO has been issued. thanks!
MohdRashid
Active Contributor
0 Kudos

Hi

If you are in subcontracting PO using delivery via ME2O, You can go through via ADSUBCON instead of ME2O.  You need to see if it is compatible with your system and full fill your requirement. 

As you mentioned ZME2o it may contains variant or screen enhancement so you need to check for ADSUBCON as per your criteria 

 

Regards

Rashid Khan

daria_garrido
Discoverer
0 Kudos
Thanks Rashid, I am not using deliveries for my process. do you know any other way? thanks again