Hi team, i was requested to rollover the remaining leave period for all employees to March 31st 2025. I had created an interim accrual rule but when i effected the change it did not reflect for some employees. Any idea what i can do to roll over the leave for everyone.

Accepted Solutions (0)

Answers (1)

Answers (1)

Shirinhcm
Explorer
0 Kudos

Please check the following Steps:

  • check Table V_T556C to be sure all setting is correct
  • If the Quota is generating manually use RPTQTA00 to create or adjust leave quotas.
  •  When using Time evaluation for Quota , then run pt60 , review the generated report to ensure that the leave quota has been processed correctly