Dear all,

We need to ensure that the MRP execution by the system is complete in all aspects. If it is a backgroung job, we can take the log through t/c SM37.

Some times we execute MRP through t/c MD02. Is there any report/transaction/ or any other way, through which we can ensure that the MPR execution is complete ?

Best regards,

K.Kumar.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member196530
Active Contributor
0 Kudos

Dear

If your MRP has run the properly , then you evalute the result based collectively in MD46 and Indivually in MD45 .

However , when you are running MRP in MD02 -Select NETCH , 2,1,3,3,,2 with Mark Display Result before SAVE option so that u can instantly get the planning result and understand that it has run properly and planned at all level of BOM.

Regards

JH

Former Member
0 Kudos

Thanks Jial,

Before i say "NO" to the client, i would like to ensure that there is no standard reports/transactions available inSAP, which will monitor the completion of MRP execution process.

Meanwhile we are not using any planning scenario/LTP/Forecasts etc. as ours is a purely a MTO business.Hence MD45 & MD46 will not help us.