Inspection Plan with Vendor outside material assignment

0 Kudos
324

Hi,.

I plan to create inspection plan on QP01 for certain material and assign to certain vendor on material assignment. My question if my purchasing team suddenly buy the part outside the vendor which I assigned on material assignment. What will happen to that part after GR, does it get through without inspection?

( I work for custom product manufacture, which sometime our purchasing team move purchased part to other vendor to get better lead time for non critical part)

Thankyou for the answer.

Regards,

Bayan

Accepted Solutions (0)

Answers (2)

Answers (2)

Hi Bayan,

In this case, Inspection lot will be created with CRTD status. Means Inspected lot is created but the inspection plan is not assigned yet. You can assign the inspection plan manually and release the lot to proceed further with result recording and UD

holger_hartung
Contributor

HI,

I mean, inspection lot will created but whitout plan. So you need to interact if you want results recording or UD