cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection Plan Usage for Inspection Type 08 / Movement Type 322

former_member445197
Participant
0 Kudos
1,071

Hi,

Could you please let me know whether to use Usage 5 or 9 in the Inspection Plan of a material that uses Inspection Type 08 and Movement Type 322?

When Usage 5 is used, the following message appears in MB1B (Movement Type 322):

"Preparation for the quality inspection could not be completed"

Thanks for your help.

View Entire Topic
former_member42743
Active Contributor
0 Kudos

Usages and what usages are assigned to inspection types is totally configurable.

There is no RIGHT answer.

You can add/delete usages as you want.

You can change the usage used by any particular inspection type.

So when people say you should use xx or yy, it's totally based on how their system was configured or possibly what SAP delivers out of the box.

You need to find out what usage YOUR system has been configured to use with the inspection type you are using. Either look in config in the inspection type setup, or ask one of your IT people to look it up. I find the settings are often changed in many systems.

Craig