cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection lot with reference operation set assigned to material

mohamedyaminezetti
Participant
0 Kudos

Dear QM experts,

Can we create inspection lot and assign reference operation set to this inspection lot.

The link between material and reference operation set is already maintained, but i'm not able to select inspection created through qp11 in my inspection lot (error message QA233)

Please advise.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

mohamedyaminezetti
Participant
0 Kudos

Solution found!

Create usage "P" by copying "Q"

former_member201849
Contributor
0 Kudos

Hi Yaz

Thanks for the update. Can you please let me know the Transaction/SPRO path for the above reply.

Regards

Suresh.M

mohamedyaminezetti
Participant
0 Kudos

Hi Suresh

Tcode : OPEA

thanks

Answers (2)

Answers (2)

deedeeblonde
Explorer
0 Kudos

Hi guys...

I am facing up the same issue.

I have created reference operation set and I assigned the material.

During the creation of inspection lot I get the message: "No inspection plan could be found"

(Error Nº QA278)

I already did the customizing in OPEA and still I am not able to assign reference operation set to inspection lot (Inspection type 89).

Can you help me?

Thanks

mohamedyaminezetti
Participant
0 Kudos

Hello Castro,

Did you checked routing type assigned to your control origin ?

You must assign routing type S to your origin control in order to allow inspection with S Routing.

However, and don't see how can we allow more than one routing for one origin.

Hope it helps.

deedeeblonde
Explorer
0 Kudos

Thanks Yaz....!!!

That was missing in my customizing, now it is working.

As you say, we can not assign more than one routing for one origin.

Thanks again... very helpful!!!

former_member201849
Contributor
0 Kudos
mohamedyaminezetti
Participant
0 Kudos

Thanks Suresh for your reply, but could you please confirm if we can use it or not in inspection lot ?

Thanks

former_member201849
Contributor
0 Kudos

Hi Yaz

For In Process inspection we can use the Reference Operation Set (QP11).

1. Assign 03 inspection type in QM view of the Material Master.

1. Go to QP11 and click on enter and assign  usage 1 and status 4.

2. Assign Control Key as QM01.

3. Select the line and click on Insp Chars and assign required mic's and Save.

4. Group Number will create automatically by the system.

4. Create Production Order in CO01.

5. While creating Production Order select the Reference Operation Set Group.

6. Release the Order.

7. Inspection Lot will get generated automatically and Save the Order.

8. Go to QA03 and enter the Inspection lot

9. In Inspection Lot you can see the Reference Operation Set group number.

10. In QA32/QE01/QE51N you can do the Result Recording and carry out the further processes.

Please go through the steps and if any doubts please come back.

Regards

Suresh.M

mohamedyaminezetti
Participant
0 Kudos

Thanks Suresh for this description. Indeed, we can have use reference operation set in the in process inspetion.

But, i cannot do same for the inspection type 10. Maybe i missed something in the customizing or simply it is not standard behavior.

Thx