Hi,

iam doing stability study.i have done these process

Initiate Stability study

Create Initial sample

Perform initial test

Confirm initial sample

stability planning

Define storage condition

create testing schedule

store stability sample

define cycle start

scheduled.

after call date inspection lot automatically not created.

where i have done the mistake?

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

done.

Former Member
0 Kudos

For the Maintenance order type, Inspection type (14) should have been assigned in IMG.

In the task list, inpection point should have been maintained. MIC should have been assigned to operations.

Former Member
0 Kudos

Dear Maheswaran.K

iam using stability study Inspection type (16) assigned in IMG.

In the task list, inpection point should have been maintained. MIC should have been assigned to operations.

are maintained.

i checked IP10 for maintenance plan "scheduled save to call".

Former Member
0 Kudos

While scheduling PM order, if inspection lot is to be generated then you have to use 14 as inspection type.

Scheduled save to call is to create the PM order. Save that & check in IP24 for the order number. Check the order in IW32 for the inspection lot.